Inspection the 6-lane bridge being built at Phaphamau
The Divisional Commissioner, Shri Sanjay Goyal on January 3, 2022 inspected the 6-lane bridge (and its access road) being built near Chandrashekhar Azad Setu at Phaphamau on National Highway 96. The total length of this bridge (being built by the Government of India) is 9.90 km and it is being built at a cost of nearly 1948 crores. The bridge will begin about 500 meters from Malak Harhar Uphar tri-junction (towards Pratapgarh) and will end near Tripathi intersection on Lala Lajpat Rai Marg. The completion date of this project has also been preponed to December 2023 from March 2024.